fix: repair workflows integrationtests docker #463
Triggered via pull request
November 13, 2024 11:43
Status
Cancelled
Total duration
3m 21s
Artifacts
–
integration-tests.yml
on: pull_request
Build with Maven and Docker caches
3m 14s
Annotations
2 errors
Build with Maven and Docker caches
The run was canceled by @MichaelsJP.
|
Build with Maven and Docker caches
The operation was canceled.
|