Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

tiflash: upgrade guide #20128

Open
wants to merge 2 commits into
base: master
Choose a base branch
from
Open

Conversation

JinheLin
Copy link
Contributor

First-time contributors' checklist

What is changed, added or deleted? (Required)

Which TiDB version(s) do your changes apply to? (Required)

Tips for choosing the affected version(s):

By default, CHOOSE MASTER ONLY so your changes will be applied to the next TiDB major or minor releases. If your PR involves a product feature behavior change or a compatibility change, CHOOSE THE AFFECTED RELEASE BRANCH(ES) AND MASTER.

For details, see tips for choosing the affected versions (in Chinese).

  • master (the latest development version)
  • v9.0 (TiDB 9.0 versions)
  • v8.5 (TiDB 8.5 versions)
  • v8.4 (TiDB 8.4 versions)
  • v8.3 (TiDB 8.3 versions)
  • v8.1 (TiDB 8.1 versions)
  • v7.5 (TiDB 7.5 versions)
  • v7.1 (TiDB 7.1 versions)
  • v6.5 (TiDB 6.5 versions)
  • v6.1 (TiDB 6.1 versions)
  • v5.4 (TiDB 5.4 versions)

What is the related PR or file link(s)?

  • This PR is translated from:
  • Other reference link(s):

Do your changes match any of the following descriptions?

  • Delete files
  • Change aliases
  • Need modification after applied to another branch
  • Might cause conflicts after applied to another branch

@CLAassistant
Copy link

CLAassistant commented Mar 27, 2025

CLA assistant check
All committers have signed the CLA.

@ti-chi-bot ti-chi-bot bot added missing-translation-status This PR does not have translation status info. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. labels Mar 27, 2025
@JinheLin
Copy link
Contributor Author

@qiancai qiancai self-assigned this Mar 27, 2025
@qiancai qiancai added translation/doing This PR’s assignee is translating this PR. area/bigdata Indicates that the Issue or PR belongs to the area of TiFlash, TiSpark, and OLAP. v9.0-beta.1 This PR/issue applies to TiDB v9.0-beta.1. labels Mar 27, 2025
@ti-chi-bot ti-chi-bot bot removed the missing-translation-status This PR does not have translation status info. label Mar 27, 2025
Copy link

ti-chi-bot bot commented Mar 27, 2025

@joey-yez: adding LGTM is restricted to approvers and reviewers in OWNERS files.

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

Copy link
Contributor

@JaySon-Huang JaySon-Huang left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM

Copy link

ti-chi-bot bot commented Mar 27, 2025

@JaySon-Huang: adding LGTM is restricted to approvers and reviewers in OWNERS files.

In response to this:

LGTM

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@ti-chi-bot ti-chi-bot bot added the needs-1-more-lgtm Indicates a PR needs 1 more LGTM. label Apr 1, 2025
@ti-chi-bot ti-chi-bot bot added lgtm and removed needs-1-more-lgtm Indicates a PR needs 1 more LGTM. labels Apr 9, 2025
Copy link

ti-chi-bot bot commented Apr 9, 2025

[LGTM Timeline notifier]

Timeline:

  • 2025-04-01 07:37:55.116259916 +0000 UTC m=+1550768.800496009: ☑️ agreed by qiancai.
  • 2025-04-09 07:52:22.128873998 +0000 UTC m=+2242835.813110088: ☑️ agreed by Oreoxmt.

@qiancai
Copy link
Collaborator

qiancai commented Apr 9, 2025

/approve

Copy link

ti-chi-bot bot commented Apr 9, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: qiancai

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot bot added the approved label Apr 9, 2025
Copy link

ti-chi-bot bot commented Apr 9, 2025

@JinheLin: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
pull-verify 1d67fc3 link true /test pull-verify

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
approved area/bigdata Indicates that the Issue or PR belongs to the area of TiFlash, TiSpark, and OLAP. lgtm size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. translation/doing This PR’s assignee is translating this PR. v9.0-beta.1 This PR/issue applies to TiDB v9.0-beta.1.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

6 participants