Refactor Epoch to its own time scale #406
Triggered via pull request
September 29, 2023 17:30
Status
Failure
Total duration
3m 43s
Artifacts
–
Annotations
15 errors
no-std build (thumbv6m-none-eabi)
Process completed with exit code 101.
|
no-std build (aarch64-unknown-none)
The job was canceled because "thumbv6m-none-eabi" failed.
|
no-std build (aarch64-unknown-none)
The operation was canceled.
|
Coverage
Process completed with exit code 1.
|
Test Suite (ubuntu-latest, stable)
Process completed with exit code 101.
|
Test Suite (macos-latest, stable)
The job was canceled because "ubuntu-latest_stable_stab" failed.
|
Test Suite (windows-latest, MSRV)
The job was canceled because "ubuntu-latest_stable_stab" failed.
|
Test Suite (windows-latest, MSRV)
The operation was canceled.
|
Test Suite (windows-latest, stable)
The job was canceled because "ubuntu-latest_stable_stab" failed.
|
Test Suite (windows-latest, stable)
The operation was canceled.
|
Test Suite (macos-latest, MSRV)
The job was canceled because "ubuntu-latest_stable_stab" failed.
|
Test Suite (macos-latest, MSRV)
The operation was canceled.
|
Test Suite (ubuntu-latest, MSRV)
The job was canceled because "ubuntu-latest_stable_stab" failed.
|
Test Suite (ubuntu-latest, MSRV)
The operation was canceled.
|
Lints
Process completed with exit code 101.
|