Skip to content

[hold] Fix #714 - Switch to (mainly) sslyze for TLS testing #728

[hold] Fix #714 - Switch to (mainly) sslyze for TLS testing

[hold] Fix #714 - Switch to (mainly) sslyze for TLS testing #728

Triggered via pull request December 20, 2023 16:32
Status Failure
Total duration 10m 53s
Artifacts 4
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

docker.yml

on: pull_request
Matrix: build-docker
Fit to window
Zoom out
Zoom in

Annotations

4 errors
lint/check
Process completed with exit code 2.
test
Process completed with exit code 2.
integration-test
Process completed with exit code 2.
development-environment-test
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
Development environment test Docker Compose Logs Expired
570 KB
Integration test Docker Compose Logs Expired
996 KB
Playwright development environment test results (screenshots, video) Expired
2.3 MB
Playwright integration test results (screenshots, video) Expired
1.19 MB