Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

chore: optimize reabsorption (v8.3) -- reviewable PR #5293

Open
wants to merge 5 commits into
base: pepopowitz/4988-optimize-absorption-8-3
Choose a base branch
from

Conversation

pepopowitz
Copy link
Collaborator

@pepopowitz pepopowitz commented Mar 18, 2025

Targets the branch from #5292, not main.

Description

This is the reviewable PR for reabsorbing Optimize 8.3 (3.11.0) docs.

  • Absorb sidebars
  • Update version manifests
  • Fix links
  • Remove cross-instance infrastructure
  • Redirect optimize/3.11.0 content into docs/8.3

When should this change go live?

  • This is a bug fix, security concern, or something that needs urgent release support. (add bug or support label)
  • This is already available but undocumented and should be released within a week. (add available & undocumented label)
  • This is on a specific schedule and the assignee will coordinate a release with the DevEx team. (create draft PR and/or add hold label)
  • This is part of a scheduled alpha or minor. (add alpha or minor label)
  • There is no urgency with this change (add low prio label)

PR Checklist

  • My changes are for an upcoming minor release and:
    • are in the /docs directory (version 8.8).
    • are in the /versioned_docs/version-8.7/ directory (version 8.7).
  • My changes are for an already released minor and are in a /versioned_docs directory.

@pepopowitz pepopowitz added hold This issue is parked, do not merge. dx Documentation infrastructure typically handled by the Camunda DX team epic:optimize-versions labels Mar 18, 2025
@pepopowitz pepopowitz self-assigned this Mar 18, 2025
@pepopowitz pepopowitz added the deploy Stand up a temporary docs site with this PR label Mar 21, 2025
Copy link
Contributor

⬆️ The preview environment build results for commit a3f7c31 are being uploaded. This usually takes 3-4 minutes.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
deploy Stand up a temporary docs site with this PR dx Documentation infrastructure typically handled by the Camunda DX team epic:optimize-versions hold This issue is parked, do not merge.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

1 participant