Skip to content

Update arrow-schema requirement from 49.0.0 to 50.0.0 #8

Update arrow-schema requirement from 49.0.0 to 50.0.0

Update arrow-schema requirement from 49.0.0 to 50.0.0 #8

Triggered via pull request January 20, 2024 18:41
Status Failure
Total duration 1m 14s
Artifacts

ci.yml

on: pull_request
Matrix: test
all-tests-pass
2s
all-tests-pass
Fit to window
Zoom out
Zoom in

Annotations

9 errors
lint
Process completed with exit code 101.
test (3.10)
Process completed with exit code 2.
test (3.11)
The job was canceled because "_3_10" failed.
test (3.11)
The operation was canceled.
test (3.8)
The job was canceled because "_3_10" failed.
test (3.8)
The operation was canceled.
test (3.9)
The job was canceled because "_3_10" failed.
test (3.9)
The operation was canceled.
all-tests-pass
Process completed with exit code 1.