Some of the pictures taken during the construction of the prototype.
Image 1: Preparing the Timber | Image 2: Installing the Wire Mesh | Image 3: Completed Black Surface |
---|---|---|
Image 4: Ventilation Added | Image 5: Supporting the Top Cover | Image 6: Finished Dryer Backside |
---|---|---|
![]() |
Image 7: Closing with Polythene | Image 8: Assembling Components | Image 9: Final Construction Touches |
---|---|---|
![]() |
![]() |
||
![]() |
||
![]() |
![]() |
![]() |